Bolting plaster SR

Kysy lisätietoa

Tuotekuvaus

Fescon Bolting plaster SR, is a pumpable special plaster for reinforcement work in rock construction. The binder is made of sulphate-resistant cement. Used in tunnel excavation, and rock and infrastructure construction. CE-marked, ready-to-use dry mix that meets quality and strength requirements. 

  • Ready-for-use dry mix product with strength classification
  • Easy pumpability and good filling ability
  • Remains in place in vertical holes
  • Strength class C 35/45
  • Exposure class XC4, XS3, XD3, XA2, (100 year service life)
  • Bolting plaster SR fulfils the pull-out test requirement specified in standards EN 1504-6 and EN 1881

Käyttökohteet

  • Grouting of anchor bolts used in rock construction.    
  • Post-injection of expansion-shell anchor bolts (CT bolt or equivalent)
Tuote on listattu Pohjoismaisen Ympäristömerkinnän rakennustuotetietokantaan ja sitä voidaan käyttää Joutsenmerkityissä rakennuksissa.
GTIN-koodi Tuotenimi Tuotenumero Pakkauskoko
6416841533357 PULTTAUSLAASTI SR 25 KG 53335 25 kg

Base

  • The drill hole temperature is +5°C…+25°C.  
  • The drill hole has been flushed with pressurised water and, if necessary, blown with compressed air.
  • The bold holes must be clean, solid and dust-free.

Priming

  • The drill hole is not primed

Work instructions

  • The work area must be completely protected from wind, sun and rain.
  • During the bolting and while the plaster is hardening, the air and drill hole temperature must be +5°C…+25°C.
  • A sack (25 kg) is mixed with 4.7–5.0 litres of cold water. If the product will be pumped, add 18–20% of water of the weight of the dry product. The bolting plaster has the correct amount of water when the it does not drain out of a vertical drill hole.  
  • The amount of water must be as instructed in the product card. Deviating from the recommended amount of water reduces the bolting plaster’s strength properties, increases the bleeding risk, affects the bolting plaster’s strength development, and weakens workability. 
  • Mix the bolting plaster carefully into a uniform paste (using a horizontal pan-mixer or continuous mixer).
  • The bolting plaster is pumped into drill holes in the rock with a suitable plaster pump. The bolting plaster must fill the drill hole completely.  
  • The bolting plaster must be protected from mechanical disturbance during its strength development.
  • Workable for about one hour after adding water.
  • When finished working, wash to tools immediately with water. 
  • Remove any dried bolting plaster mechanically.

Other considerations

  • Work is performed according to the infraRYL instructions. 

Varastointi ja jätteen käsittely
Katso erillinen varastointi ja hävitysohje https://www.fescon.fi/materiaalipankki

Materiaalimenekki

approx. 2.90 kg per running metre (approx. 1.60 l/m of prepared plaster) when using ø 25 mm corrugated bar bolts in 52 mm drill holes

 

Vedentarve 4,7-5,0 l/25 kg
Olomuoto powder
Sideaine sulphate resistant cement
Väri gray
Maksimiraekoko

0.6 mm

Pakkauskoko 25 kg
Varastointi

storage time in a dry location approx. 1 year

Käyttölämpötila

+5°C...+25°C

Työstettävyysaika approx. 1 h
Lujuusluokka C 35/45
Puristuslujuus

> 45 MPa

Palokäyttäytyminen A1
Rasitusluokat XC4, XS3, XD3, XA2 (100 year service life)
Vastuunrajaus, tuotteen käyttöön liittyvät huomiot ja rajoitukset: Tutustu Fescon Oy:n yleisiin toimitusehtoihin ja tuotteeseen liittyviin suunnittelu- sekä työohjeisiin.